Consolidated Edison
Company type | Public |
---|---|
Industry | Energy |
Founded | March 26, 1823 1871 – Harlem Gas Light Company 1884 – Consolidated Gas Company | – as New York Gas Light Company
Headquarters | Consolidated Edison Building, New York City , U.S. |
Area served | New York metropolitan area |
Key people | Tim Cawley (CEO)[1] |
Services |
|
Revenue | US$14.66 billion (2023)[2] |
US$3.196 billion (2023)[2] | |
US$2.516 billion (2023)[2] | |
Total assets | US$66.33 billion (2023)[2] |
Total equity | US$21.16 billion (2023)[2] |
Number of employees | 14,592 (2023)[2] |
Website | coned |
Consolidated Edison, Inc., commonly known as Con Edison (stylized as conEdison) or ConEd, is one of the largest investor-owned energy companies in the United States, with approximately $12 billion in annual revenues as of 2017, and over $62 billion in assets.[3] The company provides a wide range of energy-related products and services to its customers through its subsidiaries:
- Consolidated Edison Company of New York, Inc. (CECONY), a regulated utility providing electric and gas service in New York City and Westchester County, New York, and steam service in the borough of Manhattan;
- Orange and Rockland Utilities, Inc., a regulated utility serving customers in a 1,300-square-mile (3,400 km2) area in southeastern New York and northern New Jersey; and,
- Con Edison Transmission, Inc., which invests in electric and natural gas transmission projects.
In 2015, electric revenues accounted for 70.35% of consolidated sales (70.55% in 2014); gas revenues 13.61% (14.96% in 2014); steam revenues 5.01% (4.86% in 2014); and non-utility revenues of 11.02% (9.63% in 2014).[4]
History
[edit]In March 1823, Con Edison's earliest corporate predecessor, the New York Gas Light Company, was founded by a consortium of New York City investors. A year later, it was listed on the New York Stock Exchange (NYSE). Due to the Board of Aldermen's authority to grant franchises in the City of New York in the early to mid-19th century, interaction with Tammany Hall was required to expand the business. By William M. Tweed's reign in the late 1860s as the boss of Tammany Hall, the power to authorize franchises lay with the County Board of Supervisors, of which Tweed had been a member. By 1871, Tweed was a member of the board of the Harlem Gas Light Company, a precursor to the Consolidated Edison Company.[5] In 1884, six gas companies combined into the Consolidated Gas Company.
The New York Steam Company began providing service in Lower Manhattan in 1882. Today, Con Edison operates the largest commercial steam system in the world, providing steam service to nearly 1,600 commercial and residential establishments in Manhattan from Battery Park to 96th Street.[6]
In 1901, the Consolidated Gas Company bought Edison Illuminating Company, which had been founded by Thomas Edison in 1880, first supplying electricity to 59 customers in a square-mile area in lower Manhattan. After the "war of currents", more than 30 companies were generating and distributing electricity in New York City and Westchester County. But by 1920 there were far fewer, and Consolidated Gas's electricity arm, now called the New York Edison Company, was the leader. In 1936, with electric sales far outstripping gas sales, the company incorporated and the name was changed to Consolidated Edison Company of New York, Inc.
The years that followed brought further amalgamations as Consolidated Edison acquired or merged with more than a dozen companies between 1936 and 1960. Con Edison today is the result of acquisitions, dissolutions, and mergers of more than 170 individual electric, gas, and steam companies.
Consolidated Edison acquired land on the Hudson River in Buchanan, NY, in 1954 for the Indian Point nuclear power plant. The first reactor (Indian Point 1) began generating power on September 16, 1962. The reactor was shut down on October 31, 1974, because the emergency core cooling system did not meet regulatory requirements. The company built two more reactors at Indian Point during the 1970s: Indian Point 2 and 3. Indian Point 3 was sold to the New York Power Authority in 1975.[7] Entergy acquired Indian Point 2 in November 2000,[8] nine months after a steam generator leak.[9] With the sale of Indian Point 2, the last power plant it owned, Consolidated Edison, Inc. became primarily an energy distributor.[8]
On January 1, 1998, following the deregulation of the utility industry in New York State, a holding company, Consolidated Edison, Inc., was formed. It is one of the nation's largest investor-owned energy companies, with approximately $13 billion in annual revenues and $47 billion in assets. The company provides a wide range of energy-related products and services to its customers through two regulated utility subsidiaries and three competitive energy businesses. Under several corporate names, the company has been traded on the NYSE without interruption since 1824—longer than any other NYSE stock. Its largest subsidiary, Consolidated Edison Company of New York, Inc., provides electric, gas, and steam service to more than 3 million customers in New York City and Westchester County, New York, an area of 660 square miles (1,700 km2) with a population of nearly 9 million. Also in 1998, Consolidated Edison, Inc. acquired Orange & Rockland Utilities, which is operated separately.[10]
Con Edison had invested $3 billion in solar and wind projects. In September 2017 it was announced that the company would invest $1.25 billion in "renewable energy production facilities over the next three years."[11]
The company's "renewable portfolio" contained more than 1.5 gigawatts of operating capacity. Seventy-five percent of that capacity came from solar energy. Clean energy accounted for around eight percent of the company's earnings, as of fall 2017.[11] Con Edison sold its clean energy business to RWE in 2023.[12]
Systems
[edit]Clean energy
[edit]To support electric vehicles, Con Edison partnered with the company FleetCarma to provide $500 in rewards to owners of electric vehicles in New York City and Westchester County, New York. Through this program, Con Edison pays customers to charge their vehicles when energy demand is low.[13]
Electrical
[edit]The Con Edison electrical transmission system utilizes voltages of 138 kilovolts (kV), 345 kV, and 500 kV. The company has two 345 kV interconnections with upstate New York that enable it to import power from Hydro-Québec in Canada and one 345 kV interconnection each with Public Service Electric and Gas (PSE&G) in New Jersey and Long Island. Con Edison's connection with Hydro-Québec is via a series of transmission lines owned by the New York Power Authority and neighboring utilities; a more direct connection via the Champlain Hudson Power Express HVDC line is expected to come online in 2025.[14]
Con Edison is also interconnected with PSE&G via the Branchburg-Ramapo 500 kV line. Con Ed's distribution voltages are 33 kV, 27 kV, 13 kV, and 4 kV.
The 93,000 miles (150,000 km) of underground cable in the Con Edison system could wrap around the Earth 3.6 times. Nearly 36,000 miles (58,000 km) of overhead electric wires complement the underground system—enough cable to stretch between New York and Los Angeles 13 times.[15]
Gas
[edit]The Con Edison gas system has nearly 7,200 miles (11,600 km) of pipes—if laid end to end, long enough to reach Paris and back to New York City, and serves Westchester County, the Bronx, Manhattan, and parts of Queens. Gas service in Brooklyn, Staten Island, and the rest of Queens is provided by National Grid USA's New York City operations, except the Rockaway peninsula, which is serviced by National Grid's Long Island operations. The average volume of gas that travels through Con Edison's gas system annually could fill the Empire State Building nearly 6,100 times.[16]
Steam
[edit]Con Edison produces 30 billion pounds of steam each year through its seven power plants which boil water to 1,000 °F (538 °C) before distributing it to hundreds of buildings in the New York City steam system, which is the biggest district steam system in the world.[17] Steam traveling through the system is used to heat and cool some of New York's most famous addresses, including the United Nations complex, the Empire State Building, and the Metropolitan Museum of Art.[18]
Metering
[edit]The Smart Meter Project was awarded to Aclara Smart Grid Solutions (electric) and the majority of the rollout was completed in 2022 with several thousand meters still needing to be changed in 2023 due to customer access issues. ConEd utilized Aclara's metering products for field installation. Over five million electric and gas meters were replaced in this project. Lime green-colored seals were used on electric meters to indicate that the meter was changed by a contractor.
Programs and resources
[edit]ConEd offers a variety of programs and resources for its customers and stakeholders, organized in such categories as, "For Renters", "For Residential Owners", "For Small & Medium Businesses", "For Commercial & Industrial", "Business Partners", "Investors", "Community Affairs", and "Municipalities".[19] Examples of such resources include:
- CONCERN Program, which offers eligible customers a specially trained representative and advice about government aid programs, safety tips, and ways to save money on one's energy bill[20]
- Quarterly Billing Plan, which allows senior citizens, whose Con Edison bills are less than $420 a year, to receive bills once every three months (in March, June, September, and December), rather than once a month[20]
- SPOTLIGHT, Con Edison's newsletter[20][21]
Community partnerships
[edit]Con Edison contributes substantial funding and volunteer hours to many non-profit organizations and learning centers including New York Botanical Garden, Hudson Valley Groundworks Science Barge, Teatown Reservation, Jay Heritage Center, and the Intrepid Sea, Air & Space Museum.
Leadership and associations
[edit]- Timothy P. Cawley, Chairman, president and Chief Executive Officer, Consolidated Edison, Inc.
- Matt Ketschke, president, Con Edison of New York
- Michelle O'Connell, president and CEO, Orange and Rockland Utilities, Inc.
- Stuart Nachmias, president and CEO, Con Edison Transmission
- Robert Sanchez, president, Shared Services
- Kirkland Andrews, senior vice president and chief financial officer
- Mary E. Kelly, senior vice president and chief information officer
- Jennifer Hensley, senior vice president, Corporate Affairs
- Yukari Saegusa, vice president, Treasury and Investor Relations
- Edlyn Misquita, vice president and general auditor
- Sylvia Dooley, vice president and corporate secretary
- Joseph Miller, vice president, controller and chief accounting officer
- Deneen L. Donnley, senior vice president and general counsel
- Scott Sanders, vice president, Business Finance
- Edward L. Conway, ombudsman
ConEd Solutions is a member of Real Estate Board of New York.[22]
Major accidents and incidents
[edit]- 1977: All of New York City, with the exception of the Rockaways - which get their power from the Long Island Lighting Company (LILCo) - was blacked out overnight on July 13 and 14, due to lightning strikes on a number of sub-stations and the resulting failures of interconnects in the power grid.
- 1989: A steam pipe explosion in Gramercy Park killed three, injured 24, and required the evacuation of a damaged apartment building due to high levels of asbestos in the air. Workers had failed to drain water from the pipe before turning the steam on. The utility also eventually pleaded guilty to lying about the absence of asbestos contamination, and paid a $2 million fine.[23]
- 2001: The Con Edison electricity substation at 7 World Trade Center was destroyed on September 11th as a result of the collapse of Numbers 1 and 2 World Trade Center following a terrorist attack by Muslim extremists against the United States.
- 2004: In Manhattan, stray voltage killed East Village resident Jodie Lane and her dog when she stepped on a service box that wasn't properly insulated.[24] The corner of East 11th Street and 1st Avenue, where the incident occurred, was given the alternate name of Jodie Lane Place in 2005.[25]
- 2006: After the blackout in Queens, the company was criticized by public officials for a poor record in the restoration of service to its customers.[26]
- 2007: On July 18, an explosion occurred in midtown Manhattan near Grand Central Terminal when an 83-year-old Con Edison steam pipe failed, resulting in one death, over 40 injuries, as well as subway and surface disruptions.[27]
- 2007: The day before Thanksgiving, an explosion critically burned Queens resident Kunta Oza when an 80-year-old cast iron gas main ruptured. Oza died on Thanksgiving Day, and her family later settled with Con Edison for $3.75 million.[28]
- 2009: Another gas explosion claimed a life in Queens while Con Edison personnel were on the scene. There was a leak in a manhole and a fault in an electrical feeder at the same time. The fault in the feeder caused the explosion due to the sparks being generated. When the mechanic opened the manhole more oxygen entered and the explosion took place.[citation needed] Due to that event, Con Edison has changed its procedure on outside gas leak calls.[29]
- 2012:
- On October 29, flooding from Hurricane Sandy caused a transformer explosion at a Con-Ed plant on New York City's East Side.[30][31]
- During the storm, Con Edison used social media to get outage and restoration information out to customers. The company's Twitter account gained an extra 16,000 followers during the storm.[32][33]
- Con Edison's subsidiary, Orange & Rockland Utilities, was criticized for its response to Hurricane Sandy. Some customers experienced a loss of electrical power for 11 days.[34]
- 2014: On March 12, two apartment buildings exploded in East Harlem after a reported Con Edison gas leak. Eight people were killed in the massive explosion that reduced the conjoining buildings to rubble.[35][36]
- 2018: After 9 p.m. on December 27, a transformer short-circuit[37] at a ConEd power plant in Astoria, Queens shut down La Guardia Airport for several hours - until it switched to back-up generators - caused extensive delays on the #7 subway line, and an outage on Rikers Island, until it, too, reverted to back-up equipment.[38] The incident caused a large portion of the sky in the surrounding area to be lit up by blue light[39] that was caused by arc flashes, in which light-emitting atoms of excited gas, called plasma, are projected into the air. The arc flashes probably lasted only a few minutes, but because of meteorological conditions which caused them to be refracted, they were seen across a large portion of the New York City metropolitan area.[37][38] There was no explosion or fire connected to the electrical surge,[37] and no reported injuries.[40] The New York Police Department reported that 911 calls increased from 500 in the half-hour before the event to over 3,200 in the 30 minutes afterwards. ConEd is investigating the cause of the surge in equipment that was intended to monitor voltage in the electrical sub-station, but suspects that the problem was a malfunctioning of its relay system.[38] The lights were nicknamed the "Astoria Borealis" on Twitter.[41]
- 2019: On the night of July 13 a significant portion of Manhattan saw a blackout due to a Consolidated Edison cable that burnt out in a transformer on West End Avenue.[42][43] The blackout, which lasted for about three hours, shut down a number of subway stations, much of the West Side from the 40s to 72nd Street, parts of Times Square and Rockefeller Center, and other areas, resulting in an estimated 73,000 customers losing power.[44] The outage fell on the anniversary of the 1977 blackout, where most of the city lost power.
- 2020: During the COVID-19 pandemic in the United States, 170 Con Edison employees tested positive for COVID-19 and three died.[45][46] Consolidated Edison said they would not shut off service due to non-payment related to the health crisis and would waive any new late-payment charges for customers.[47]
Bribery prosecution
[edit]On January 14, 2009, eleven Con Edison supervisors were arrested for demanding more than $1 million in kickbacks related to work done by a construction company that was repairing the Midtown steam pipe eruption of 2007. According to federal prosecutors, the employees had approved payment for work that was unnecessary or not performed and promised faster payment for some work performed by the construction company in exchange for the bribes. The FBI had two retired Con Edison employees and the president of the construction company wear recording devices that recorded the suspects demanding bribes of between $1000 and $5000.[48] Later that year Con Edison sued Brendan Maher, one of the construction supervisors who was arrested and later admitted to taking bribes that the utility company claimed amounted to $10,000.[49]
In April 2016, Con Edison agreed to pay over $171 million, about 1.5% of its annual revenue, back to its customers in compensation for harm resulting from the bribery. The Public Service Commission had found that Con Edison failed to supervise the employees. Con Edison admitted no wrongdoing.[50]
Honors and criticism
[edit]● In March 2002, Fortune magazine named the company as one of "America's Most Admired Companies" in the publication's newest corporate ranking survey. In 2003, Con Edison ranked second on the top ten list for electric and gas utilities.[51]
● In December 2011, the non-partisan organization Public Campaign released a report criticizing ConEd for spending $1.8 million on lobbying and not paying any taxes during 2008–2010, instead getting $127 million in tax rebates, despite making a profit of $4.2 billion, and increasing executive pay by 82% to $17.4 million in 2010 for its top five executives.[52]
● In 2014, Con Edison was named the #1 utility and #16 overall among corporations, in Newsweek's Green Rankings, and one of the 50 best companies for Latinas by Latina Style Magazine.[53] In its "Best of the Best" issue in 2015, Hispanic Network Magazine named the company a top employer among energy, gas, and oil companies.[54] Con Edison was also selected as one of the top regional utilities by DiversityInc magazine in 2014.[55] In 2016, the company was listed among America's best large employers by Forbes.[citation needed]
● In February 2021, The Energy and Policy Institute criticized Con Edison for touting clean energy while investing in Gas Infrastructure.[56] This is unclean fracked gas. (Fracked gas is methane gas produced by hydraulic fracturing.) The article explained, "A recent analysis of utility executive compensation by the Energy and Policy Institute found that Con Edison’s executive compensation policies include renewable energy growth as components of broader goals, but do not reward executives for reducing greenhouse gas emissions.
Stop tags
[edit]When a New York City contractor is unable to repair a reported nonfunctioning or malfunctioning street light, traffic light or pedestrian Walk/Don't Walk light because of a failure in the power to the affected unit,[57]: p. 92 a stop tag is assigned by Con Ed.[58] When a caller to NYC's 311 asks for followup information about a reported outage, they're told the stop tag number, and told to call Con Ed at 800-752-6633 (800-75-CON-ED).[59]
The New York Times wrote that it can take over two years for some repairs.[58] Sometimes an entire fixture must be removed, repaired, then returned. Other times the streets must be torn up to replace underground wiring. Temporary fixes, using what was described as "nothing more than overhead extension cords" (called "Shunts") at times are left in place for an extended period.[58] In 2017 Con Ed committed to repair "at least 90% ... within 90 days."[57]: p. 92
Adaptive re-use of former Con Ed buildings
[edit]A former Con Edison building on West 53rd Street in Manhattan was converted first into the studio for the television game show Let's Make a Deal, and later into a recording studio called "Power Station" because of its Edison history. In 1996, the studio was renamed Avatar Studios and then in 2017 back to "Power Station".
In 1978, Con Edison sold the Excelsior Power Company Building, a former substation on Gold Street in Manhattan's Financial District. It was renovated into an apartment building,[60] and became a New York City designated landmark in 2016.[61]
See also
[edit]- 2006 Queens blackout
- 2007 New York City steam explosion
- 2017 Farragut Station oil spill
- Carmine DeSapio
- Consolidated Edison Building
- Gashouse District
- George Metesky, "the Mad Bomber", terrorized NYC for perceived mistreatment by Con Ed
- Indian Point Energy Center
- Northeast blackout of 1965
- Northeast blackout of 2003
- New York City blackout of 1977
- New York City steam system
- Scenic Hudson Preservation Conference v. Federal Power Commission
- September 11, 2001 terrorist attacks against the United States
- September 2013 New Haven Line power outage
- Transmission Owner Transmission Solutions
References
[edit]- ^ "Con Edison Names Timothy Cawley Chief Executive Officer; Con Edison of New York Names Matthew Ketschke President". Cision Distribution (Press release). PR Newswire. Consolidated Edison. September 17, 2020.
- ^ a b c d e f "Consolidated Edison 2023 Form 10-K Annual Report". U.S. Securities and Exchange Commission. February 15, 2024.
- ^ "Consolidated Edison Company Information". Retrieved August 14, 2021.
- ^ "Con Edison Reports 2014 Earnings" (Press release). conEdison. February 19, 2015. Archived from the original on September 29, 2018. Retrieved January 29, 2021.
- ^ Allen, Oliver E. (1993). The Tiger: The Rise and Fall of Tammany Hall. Addison-Wesley Publishing Company. pp. 54–62, 100–125. ISBN 0-201-62463-X.
- ^ "'A Tale of Two Cities – New York' – The New York City Steam System". International District Energy Association. Retrieved January 9, 2008.
With district steam service commencing in 1882, Con Edison owns and operates the largest downtown steam system in the world, serving over 1600 buildings with steam supplied from multiple combined heat and power facilities with total capacity of 21,755 (Mlbs/hr) and 627 MW. In 1999, Con Ed completed the ten-year Steam Enhancement program, investing over $200 million in system upgrades and maintenance.
[permanent dead link] - ^ "At Indian Pt., a 30-Year History of Nuclear Power, Problems and Controversy". The New York Times. May 6, 1983. Retrieved June 16, 2019.
- ^ a b Archibold, Randal C. (September 7, 2000). "Con Edison Sells Indian Point 2, Its Last Major Electricity Plant". The New York Times. Retrieved June 16, 2019.
- ^ Newman, Andy; Wald, Matthew L. (February 16, 2000). "Leak at Indian Pt. Nuclear Plant Prompts Shutdown and an Alert". The New York Times. Retrieved June 16, 2019.
- ^ Holson, Laura M. (May 11, 1998). "Con Ed Seen Paying $790 Million To Acquire Orange and Rockland". The New York Times. ISSN 0362-4331. Retrieved September 15, 2018.
- ^ a b Kovaleski, Dave (September 28, 2017). "Con Edison makes investment in clean energy". Daily Energy Insider. Archived from the original on September 28, 2017. Retrieved October 10, 2017.
- ^ "RWE completes $6.8B acquisition of Con Edison Clean Energy Businesses".
- ^ "A look at which US utility companies are running EV programs". FleetCarma. April 11, 2018. Retrieved November 19, 2018.
- ^ "Champlain Hudson Power Express Project Development Portal". Transmission Developers Inc. 2017. Retrieved March 27, 2017.
- ^ "Electric System". Con Edison. Archived from the original on January 25, 2008. Retrieved January 9, 2008.
Con Edison operates one of the most complex electric power systems in the world. It is also the world's most reliable.
- ^ "Gas System". Con Edison. Archived from the original on February 22, 2008. Retrieved January 9, 2008.
Con Edison distributes natural gas to 1.1 million customers in Manhattan, the Bronx, and portions of Queens and Westchester County, making us one of the larger gas distribution companies in the United States.
- ^ Bevelhymer, Carl. "Steam". Gotham Gazette. Archived from the original on August 13, 2007. Retrieved January 9, 2008.
When John Velez, co-owner of Sutton Cleaners, arrives at work at 7 a.m. on Manhattan's East Side, he opens a steam valve in the back of his shop. 'When I come into the shop in the morning, it's one, two, three,' he says, 'and you're up and running in less than a minute.'
- ^ "Steam System". Con Edison. Archived from the original on August 21, 2007.
The New York Steam Company began providing service in lower Manhattan in 1882. Today, Con Edison operates the largest steam system in the world. The system contains approximately 105 miles (169 km) of mains and service pipes and 3,000 steam manholes. Steam is provided from seven Con Edison steam-generating plants, five in Manhattan, one in Queens, and one in Brooklyn, along with receiving steam under contract from a steam plant at the Brooklyn Navy Yard.
- ^ "Home Page Categories Menu". ConEd.com. Archived from the original on December 25, 2005.
- ^ a b c "If You're a Senior Citizen". ConEd.com.
- ^ SPOTLIGHT (PDF). ConEd. Winter 2013. Archived from the original (PDF) on March 30, 2017. Retrieved March 29, 2017.
- ^ "Visit REBNY". www.rebny.com. Archived from the original on August 23, 2017. Retrieved May 6, 2018.
- ^ Pitt, David E (August 24, 1989). "Evacuation For Asbestos Near Blast Site". The New York Times. Retrieved January 9, 2008.
More than 200 residents of a Gramercy Park apartment building that was heavily damaged in a steam-pipe explosion over the weekend were ordered from their homes last night after tests showed what a Consolidated Edison official called "extremely high" levels of asbestos fibers throughout the building.
- ^ Chan, Sewell (March 4, 2006). "Con Ed Finds 1,214 Stray Voltage Sites in One Year". The New York Times. Archived from the original on April 8, 2008. Retrieved January 9, 2008.
Consolidated Edison, responding to testing requirements imposed after a woman (Jodie Lane) was electrocuted while walking her dog in the East Village in 2004, found 1,214 instances of stray voltage during a yearlong examination of electrical equipment on city streets, officials disclosed at a City Council hearing yesterday.
- ^ Widdison, Marissa; Sclafani, Tony (May 3, 2005). "JODIE GETS HER PLACE OF HONOR". New York Daily News. Retrieved March 17, 2024.
- ^ Chan, Sewell. "Con Edison Is Ordered to Return $18 Million to Customers" Archived December 21, 2013, at Wikiwix The New York Times (November 7, 2007)
- ^ "STEAM REPORT: BUBBLE COLLAPSE WATERHAMMER CAUSED LEXINGTON AVENUE INCIDENT". Con Edison. Archived from the original on February 22, 2008. Retrieved January 9, 2008.
The steam pipe rupture at Lexington Avenue and East 41 Street on July 18 was caused by a bubble-collapse water hammer that generated a momentary force against the pipe's wall that was more than seven times greater than the pipe's normal operating pressure, according to reports issued today by two independent experts commissioned by Con Edison. The pipe itself was found to be in good condition and did not contribute to the event.
- ^ "Anger over gas explosion death". Daily News. New York. December 20, 2007. Archived from the original on December 23, 2007.
- ^ Wilson, Michael (April 26, 2009). "House Exploded Just Before a Check, Con Ed Says". The New York Times. Retrieved April 30, 2010.
- ^ TrillianMedia (October 29, 2012). "Sandy_ConEd Explosion - Hurricane Sandy". Archived from the original on February 20, 2018. Retrieved May 6, 2018 – via YouTube.
- ^ "Massive Con Ed Transformer Explosion Blamed For Widespread Outage". CBS. October 30, 2012. Archived from the original on October 31, 2012. Retrieved October 31, 2012.
- ^ Gabbatt, Adam. "How companies used social media during Hurricane Sandy" Archived June 29, 2016, at the Wayback Machine The Guardian (February 20, 2013)
- ^ Anderson, Jared. "How Con Edison Effectively Relied on Social Media to Reach Customers During Superstorm Sandy" Archived April 16, 2015, at Wikiwix Breaking Energy (July 30, 2014)
- ^ Sullivan, S. P. "State hearing in Ramsey will focus on Orange & Rockland's Hurricane Sandy response" Archived January 2, 2013, at the Wayback Machine NJ.com (December 7, 2012)
- ^ Santora, Marc "At Least 3 Killed as Gas Explosion Hits East Harlem" Archived March 12, 2014, at the Wayback Machine The New York Times (March 12, 2014)
- ^ Santora, Marc; Rashbaum, William K. (March 13, 2014). "Rescue Effort in East Harlem Yields Only More Victims". The New York Times. Archived from the original on March 13, 2014. Retrieved March 13, 2014.
- ^ a b c Koren, Marina (December 28, 2018) "An Ancient Tradition Unfolds in New York" The Atlantic
- ^ a b c Staff (December 28, 2018) "'Electrical arc' turns night sky blue in NYC" WABC-TV Eyewitness News
- ^ Salam, Erum; Lyons, Kate (December 28, 2018). "New York City sky lights up bright blue after Queens power plant explosion". The Guardian. Retrieved December 28, 2018.
- ^ "LaGuardia Temporarily Shuttered As Con Edison Transformer Explosion In Queens Lights Sky, Social Media Ablaze". WLNY. December 27, 2018.
- ^ Gold, Michael (December 28, 2018) "How an Explosion (Not Aliens) Turned New York’s Night Sky an Electric Blue" The New York Times
- ^ McGeehan, Patrick (July 15, 2019). "A Burning 13,000-Volt Cable Touched Off Manhattan Blackout, Con Edison Says". The New York Times. ISSN 0362-4331. Retrieved July 15, 2019.
- ^ Hartmann, Margaret; Danner, Chas (July 14, 2019). "Power Back On After Blackout Strikes Manhattan". Intelligencer. Retrieved September 17, 2024.
- ^ Bailey, Sarah (July 13, 2019). "New York City power outage hits thousands in the heart of Manhattan". Washington Post. Retrieved July 15, 2019.
- ^ Gerson Freitas Jr (April 3, 2020). "ConEd Hit by Virus as Cases in New York Surge Past 100,000". Bloomberg. Archived from the original on April 5, 2020. Retrieved May 22, 2020.
Consolidated Edison Inc. has 170 employees who have tested positive for Covid-19, and three have died, according to spokesman Michael Clendenin.
- ^ "3 Con Ed employees die after testing positive for coronavirus". Westchester News 12. April 2, 2020. Archived from the original on April 5, 2020. Retrieved May 22, 2020.
The victims are Melissa Tucker, who worked within Con Ed's construction sector since 2017, Adrian Phillips who worked in customer operations for more than two decades and Joe Cardona, a business agent within the Local 12, the Utility Workers Union of America.
- ^ "Con Edison To Customers: We're All In This Together". coned.com. conEdison. March 17, 2020. Archived from the original on May 14, 2020. Retrieved May 22, 2020.
Con Edison will not shut off electric, natural gas or steam service due to payment difficulties resulting from the health crisis. And we are waiving new late-payment charges for all customers. What's more, we're suspending the fee usually charged to a customer who is unable to grant access to their property.
- ^ Belson, Ken (May 6, 2018). "11 Con Ed Supervisors Arrested on Kickback Charges". The New York Times. Archived from the original on July 25, 2016. Retrieved May 6, 2018.
- ^ "Courthouse News Service". Archived from the original on May 8, 2016. Retrieved April 21, 2016.
- ^ "Con Ed to Pay $171M to Customers for Bribery and Kickbacks". nbcnewyork.com. April 21, 2016. Archived from the original on October 6, 2016. Retrieved May 6, 2018.
- ^ "Con Edison One of America's Most Admired Companies". thefreelibrary.com. Archived from the original on March 5, 2016. Retrieved June 19, 2013.
- ^ Portero, Ashley. "30 Major U.S. Corporations Paid More to Lobby Congress Than Income Taxes, 2008–2010". International Business Times. Archived from the original on January 7, 2012. Retrieved December 26, 2011.
- ^ "Latina Style announces the 2014 Latina Style 50 Report". Latina Style. 2014. Archived from the original on April 19, 2015. Retrieved April 15, 2015.
- ^ "Hispanic Network Magazine announces its Spring 2015 early results best of the best lists". Hispanic Network Magazine. 2015. Archived from the original on April 15, 2015.
- ^ "The 2014 DiversityInc Top 7 Utilities". Diversity Tech. Archived from the original on October 12, 2014.
- ^ Itai Vardi, Energy and Policy Institute, 'While Touting Clean Energy Steps Con Edison Continues to Invest in Gas Infrastructure'
- ^ a b "Consolidated Edison Company of New York, Inc. Cases 16-E-0060 and 16-G-0061".
- ^ a b c Ian Urbina (July 14, 2004). "Report by City Scolds Con Ed For Slow Fixes". The New York Times.
- ^ "Streetlight Complaint".
To follow up on a street light work order with a stop tag number, call Con Edison
- ^ White, Norval; Willensky, Elliot; Leadon, Fran (2010). AIA Guide to New York City (5th ed.). New York: Oxford University Press. p. 43. ISBN 978-0-19538-386-7.
- ^ "Financial District's Excelsior Power Company Building Gets Landmark Status". DNAinfo New York. Archived from the original on November 15, 2017. Retrieved September 8, 2020.
External links
[edit]- Con Edison official website
- Orange and Rockland Utilities official website
- Consolidated Edison Inc. (Holding Company) official website
- Business data for Consolidated Edison, Inc.:
- Consolidated Edison
- Companies listed on the New York Stock Exchange
- Companies based in New York City
- Thomas Edison
- Electric power companies of the United States
- American companies established in 1823
- Energy companies established in 1823
- Companies in the Dow Jones Utility Average
- Companies in the S&P 500 Dividend Aristocrats
- 1823 establishments in New York (state)
- Tammany Hall
- William M. Tweed